Work in progress

Work has started to run some water and gas pipes. Then the bulkheads, radiators, toilet, basin, shower, galley can go in. Some tiling, flooring, lights, fan, mushrom vents, some low level ventilation, handrails, wardrobes, bed.
So, not much really.