Search This Blog

Thursday 29 April 2010

Work in progress

Work has started to run some water and gas pipes. Then the bulkheads, radiators, toilet, basin, shower, galley can go in. Some tiling, flooring, lights, fan, mushrom vents, some low level ventilation, handrails, wardrobes, bed.
So, not much really.

Friday 9 April 2010

Beer Festival

There is a real ale beer festival on in Brighton. Research is continuing into the merits of differing Ales. I was going to report on the merits of each one but keep losing track.

Tuesday 6 April 2010

North Kilworth Wharf

Called to talk to John and Jane about some work required on Jubilee. They are arranging some new bulkheads, doors, plumbing, radiators, Shower and kitchen. (Heads and Galley if you must.)